Waterproofing inspection in Clyde North

Wet area membranes inspected once they have cured and before the tiler covers them.

  • Once the membrane has cured and before the tiler arrives
  • About 1 hour on site
  • Report within 24 hours
Request your quoteTell us the stage or the property and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookOnce the membrane has cured and before the tiler arrives
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Clyde North waterproofing inspection

  • Membrane coverage on floors and up walls
  • Continuity at wall to floor junctions
  • Water stop angles at shower and door openings
  • Water stop or upstand around the bath
  • Bond breakers and bandages at corners
  • Puddle flanges and membrane at the waste
  • Waste gully depth for a proper water seal
  • Membrane thickness even, no lumps under tiles
  • Damage from trades since application
  • No MDF or raw timber inside the shower zone
  • Balcony and hob membranes where present
  • Membrane cured before tiling starts
Why it matters here

Waterproofing inspections on Clyde North builds

The waterproofing faults we record in Clyde North are mostly at the edges of the membrane: a door with no proper water stop, a bath with no angle for the membrane to finish against, a split where the wall meets the floor, damage from another trade walking through. An MDF architrave fitted inside a shower turns up too. All of them are hidden for good once the tiles are on.

What we find at this stage in Clyde North

  • Membrane damaged before tiling
  • Split at the wall to floor junction
  • No water stop angle around the bath
  • MDF trim inside the shower area
  • Thick build-up of membrane in corners
Thick build-up of membrane and bandage in a shower corner, uneven under tiles, found during a waterproofing inspection in Clyde North
Membrane and bandage piled up in a shower corner
Sample findings

Sample defects found during our waterproofing inspections in Clyde North

Annotated findings from Waterproofing inspections.

Waterproofing membrane damaged and needing repair before any tiles are laid, found during a waterproofing inspection in Clyde North
Waterproofing membrane damaged and needing repair before any tiles are laid
Membrane split at the wall junction, breaking the continuity of the seal, found during a waterproofing inspection in Clyde North
Membrane split at the wall junction, breaking the continuity of the seal
No water stop angle around the bath, leaving the membrane nowhere to finish, found during a fixing stage inspection in Clyde North
No water stop angle around the bath, leaving the membrane nowhere to finish
MDF architrave fitted inside a shower area, where it will swell and fail, found during a waterproofing inspection in Clyde North
MDF architrave fitted inside a shower area, where it will swell and fail

The other stages of a Clyde North build

  1. Bored piers inspection in Clyde North1Bored piersWith the holes bored and cages ready, before the concrete arrives
  2. Slab pre-pour inspection in Clyde North2Slab pre-pourSteel tied and formwork set, the day before the pour
  3. Frame inspection in Clyde North3FrameWalls and trusses standing, roof cover on, nothing lined
  4. Lock-up (pre-plaster) inspection in Clyde North4Lock-up (pre-plaster)Cladding, roof and external doors complete, services roughed in, before plaster
  5. Fixing inspection in Clyde North5FixingPlaster, doors and joinery in, before painting starts
  6. Pre-handover (PCI) inspection in Clyde North7Pre-handover (PCI)About two weeks out from the handover appointment

All construction stage inspections in Clyde North →

Guides

Construction stage guides for Clyde North

All guides →

Book a waterproofing inspection in Clyde North

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Clyde North: common questions

Which standard covers waterproofing?

AS 3740 for domestic wet areas, read with the NCC. Balconies and external decks have their own requirements under AS 4654.

What does a water stop angle do?

It forms a raised edge at the shower or door so water on the floor cannot run under the threshold. The membrane laps onto it.

Can damaged membrane be patched?

Usually, if it is cleaned back and reapplied over the damaged area with the right overlap. The patch should be inspected before tiling.

Why is MDF a problem in a shower?

It absorbs water and swells, and once it swells it breaks the sealant around it. Shower areas need moisture resistant materials.

How much time does a membrane inspection need?

About an hour, depending on how many wet areas there are.

Is waterproofing ever checked by anyone else?

The waterproofer may issue a certificate, and the building surveyor's inspections do not usually include the membrane. An independent look before tiling is the only check many homes get.