Slab pre-pour inspection in Clyde North

Steel, barrier and termite parts checked the day before the concrete truck arrives.

  • Steel tied and formwork set, the day before the pour
  • About 1 hour on site
  • Report within 24 hours
Request your quoteTell us the stage or the property and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookSteel tied and formwork set, the day before the pour
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Clyde North slab pre-pour inspection

  • Trench mesh standing upright on proper supports
  • Bar chairs spaced so mesh holds its height
  • Laps and splices tied in ribs and beams
  • Concrete cover at edges and under the steel
  • Beam widths and depths against the slab design
  • Waffle pods spaced and secured
  • Vapour barrier lapped and taped at every pipe
  • Termite collars and system parts in position
  • Shower recesses and set-downs formed
  • Edge formwork tight, straight and braced
  • Plumbing points capped against debris
  • Excavations free of soil and offcuts
  • Slab set-out compared with the house plan
Why it matters here

Slab pre-pour inspections on Clyde North builds

On Clyde North waffle slabs the problems we photograph are rarely dramatic. They are mesh sitting on its side against the formwork, rib splices nobody tied, termite collars fitted at the top of a conduit rather than in the slab, and pipes punched through the vapour barrier without tape. Each is a few minutes' work before the pour and close to impossible to correct after it.

What we find at this stage in Clyde North

  • Termite collars installed in the wrong place on conduits
  • Splices in internal ribs not tied
  • Vapour barrier left untaped at service penetrations
  • Reinforcement too close to the edge for full cover
  • Bar chairs missing or out of position
Bar chairs out of position, leaving the slab mesh poorly supported, found during a slab pre-pour inspection in Clyde North
Bar chairs out of place under the slab mesh
Sample findings

Sample defects found during our slab pre-pour inspections in Clyde North

Annotated findings from Slab pre-pour inspections.

Termite collars fitted at the top of conduits instead of within the slab, found during a slab pre-pour inspection in Clyde North
Termite collars fitted at the top of conduits instead of within the slab
Reinforcement splices in the internal ribs left untied before the pour, found during a slab pre-pour inspection in Clyde North
Reinforcement splices in the internal ribs left untied before the pour
Service pipes through the vapour barrier left untaped and unsleeved, found during a slab pre-pour inspection in Clyde North
Service pipes through the vapour barrier left untaped and unsleeved
Reinforcement sitting too close to the edge for the required concrete cover, found during a slab pre-pour inspection in Clyde North
Reinforcement sitting too close to the edge for the required concrete cover

The other stages of a Clyde North build

  1. Bored piers inspection in Clyde North1Bored piersWith the holes bored and cages ready, before the concrete arrives
  2. Frame inspection in Clyde North3FrameWalls and trusses standing, roof cover on, nothing lined
  3. Lock-up (pre-plaster) inspection in Clyde North4Lock-up (pre-plaster)Cladding, roof and external doors complete, services roughed in, before plaster
  4. Fixing inspection in Clyde North5FixingPlaster, doors and joinery in, before painting starts
  5. Waterproofing inspection in Clyde North6WaterproofingOnce the membrane has cured and before the tiler arrives
  6. Pre-handover (PCI) inspection in Clyde North7Pre-handover (PCI)About two weeks out from the handover appointment

All construction stage inspections in Clyde North →

Guides

Construction stage guides for Clyde North

All guides →

Book a slab pre-pour inspection in Clyde North

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Clyde North: common questions

Why do termite collars have to be in the slab?

They seal the gap around a pipe or conduit as it passes through the concrete. Fitted above the slab, they leave that gap open as a hidden path for termites.

Does an untied splice really matter?

Yes. During the pour the bars can move apart, so the lap no longer transfers load as the design intended.

What is concrete cover?

The depth of concrete between the steel and the outside of the slab. Thin cover lets moisture reach the steel, and rusting steel swells and cracks the concrete.

Do you check the slab design itself?

No. The engineer designs it and the building surveyor approves it. We check that what is on site matches the design.

Can the pour go ahead with items open?

That is the builder's call, but most items are fixed on the spot once raised. The report records what was outstanding when we left.

How long is the inspector at the slab?

About an hour for a single storey slab, a little more for a larger or stepped one.

CallGet a Free Quote