Frame inspection in Clyde North

The structure checked against the engineering while every stud, brace and bolt is still in view.

  • Walls and trusses standing, roof cover on, nothing lined
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteTell us the stage or the property and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookWalls and trusses standing, roof cover on, nothing lined
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Clyde North frame inspection

  • Wall bracing fixed and tensioned per the engineering
  • Roof speed bracing straight, lapped and nailed
  • Bolted and screwed connections as specified
  • Doubled studs under girder trusses
  • Studs and corners intact around the meter box
  • Bottom plates bearing on the slab, overhang within limits
  • Slab edge protrusion and honeycombing
  • Lintels and trimmers over openings
  • Wall framing plumb and straight
  • Nogging and blocking secure
  • Truss spacing, bearing and tie-down
  • Top plate joints and laminations
  • Termite management notice in place
Why it matters here

Frame inspections on Clyde North builds

Two storey frames dominate our Clyde North work, and they fail in specific ways: speed bracing in the roof left slack, a coach screw where the detail implies a bolt, a single stud under a girder truss, studs cut out to fit a meter box. None of it is visible once the plasterboard goes up, which is why this is the inspection that most often changes what the builder does next.

What we find at this stage in Clyde North

  • Roof speed bracing not tensioned
  • Coach screws in place of a bolted connection
  • Girder truss bearing on a single stud
  • Studs cut around the meter box
  • Honeycombing along the slab edge
Honeycombed concrete along the slab edge, weakening it and letting water in, found during a frame inspection in Clyde North
Honeycombed concrete along the slab edge at frame stage
Sample findings

Sample defects found during our frame inspections in Clyde North

Annotated findings from Frame inspections.

Studs cut away for the meter box, leaving the wall corner unsupported, found during a frame inspection in Clyde North
Studs cut away for the meter box, leaving the wall corner unsupported
Coach screws used where the engineering detail points to a bolted connection, found during a frame inspection in Clyde North
Coach screws used where the engineering detail points to a bolted connection
Single stud under a girder truss where a doubled stud is required, found during a frame inspection in Clyde North
Single stud under a girder truss where a doubled stud is required
Roof speed bracing left bent and slack instead of straight and tensioned, found during a frame inspection in Clyde North
Roof speed bracing left bent and slack instead of straight and tensioned

The other stages of a Clyde North build

  1. Bored piers inspection in Clyde North1Bored piersWith the holes bored and cages ready, before the concrete arrives
  2. Slab pre-pour inspection in Clyde North2Slab pre-pourSteel tied and formwork set, the day before the pour
  3. Lock-up (pre-plaster) inspection in Clyde North4Lock-up (pre-plaster)Cladding, roof and external doors complete, services roughed in, before plaster
  4. Fixing inspection in Clyde North5FixingPlaster, doors and joinery in, before painting starts
  5. Waterproofing inspection in Clyde North6WaterproofingOnce the membrane has cured and before the tiler arrives
  6. Pre-handover (PCI) inspection in Clyde North7Pre-handover (PCI)About two weeks out from the handover appointment

All construction stage inspections in Clyde North →

Guides

Construction stage guides for Clyde North

All guides →

Book a frame inspection in Clyde North

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Clyde North: common questions

What does slack speed bracing do?

Speed bracing only resists racking when it is tight. Bent or loose, it lets the roof move under wind before the brace takes any load.

Why does a girder truss need two studs?

A girder collects load from other trusses and delivers it to one point. A doubled or tripled stud carries that concentrated load down to the slab.

Is honeycombing at the slab edge a frame issue?

It is a slab issue we can only see at frame stage, once the formwork is stripped. Deep honeycombing can expose steel and let water in, so it needs repair before brickwork.

How many hours does a frame inspection need?

Two to three hours, longer on a double storey with a complex roof.

Do you need the engineering?

Yes. Bracing layouts, tie-down and connection details are checked against it. Without it, items are judged against AS 1684 and noted as such.

Will the frame inspection catch everything?

It catches what is visible. Some items are partly hidden by wrap or packing, and those are named in the report.