Clyde North Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Pre-Handover (PCI) Inspections in Clyde North

The full defect list on your new Clyde North home, compiled while the builder still needs your final payment.

  • Roof photographed by drone
  • Every room numbered on the list
  • Balcony and threshold waterproofing
  • Ducts checked in the roof space
  • Doors and windows worked by hand
  • Finishes judged to the tolerances
  • Report ready for the supervisor
  • Reinspection before settlement
Request your quoteTell us the stage or the property and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

What is included

What is included in a Clyde North pre-handover (PCI) inspection

A pre-handover inspection is assessed against your contract, plans and selections, the NCC and the Guide to Standards and Tolerances 2015. It is visual and hands-on: fittings are operated by hand, not tested or commissioned.

Roof from above

  • Tiles cracked or chipped
  • Hip and ridge capping finished
  • Vent and pipe flashings sealed
  • Valleys and gutters clear

Wet areas

  • Water stop angles at doors
  • Bath hobs intact
  • Grout and silicone complete
  • Floor falls to the waste

Roof space

  • Ducts joined and supported
  • Truss repairs to a detail
  • Insulation laid evenly

Brickwork and cladding

  • Weep holes open
  • Articulation joints sealed
  • Penetrations caulked
  • Hebel walls coated

Doors and windows

  • Swing and latch by hand
  • Gaps to frames even
  • Flashings at heads and sills

Framing at the base

  • Bottom plates on the slab
  • Slab edge trimmed at cladding

Drainage outside

  • Pipes and pits free of debris
  • Ground falling away
  • Clearance below weep holes

Internal finishes

  • Plaster flat and jointed
  • Paint coverage even
  • Tiles level and lipped
  • Joinery doors aligned

Balconies and decks

  • Balustrade fixings and height
  • Hob and membrane intact

29 checkpoints across 9 areas on a standard Clyde North pre-handover (PCI) inspection. Anything we could not reach safely on the day, such as a roof section above a steep pitch or a space blocked by stored materials, is named in the report with the reason.

Sample findings

Sample defects from our pre-handover inspections in Clyde North

Found at practical completion on Clyde North homes, before the keys changed hands.

Cracked roof tiles spotted from the drone at handover, open to rain, found during a pre-handover inspection in Clyde North
Cracked roof tiles spotted from the drone at handover, open to rain
Hip end capping left incomplete, so rain can get into the roof space, found during a pre-handover inspection in Clyde North
Hip end capping left incomplete, so rain can get into the roof space
Balustrade bolted down through the top of the balcony hob, piercing the waterproofing, found during a pre-handover inspection in Clyde North
Balustrade bolted down through the top of the balcony hob, piercing the waterproofing
Bath hob broken open during a waste pipe fix, disturbing the waterproofing, found during a pre-handover inspection in Clyde North
Bath hob broken open during a waste pipe fix, disturbing the waterproofing
Door threshold water stop too short to meet the wall flashing, found during a pre-handover inspection in Clyde North
Door threshold water stop too short to meet the wall flashing
Garage wall bottom plate overhanging the slab well past what is allowed, found during a pre-handover inspection in Clyde North
Garage wall bottom plate overhanging the slab well past what is allowed
Debris left inside a drain pipe at handover, a blockage waiting to happen, found during a pre-handover inspection in Clyde North
Debris left inside a drain pipe at handover, a blockage waiting to happen
Ducts in the roof space loose or never joined to the heating system, found during a pre-handover inspection in Clyde North
Ducts in the roof space loose or never joined to the heating system
Our building inspection team
Why Clyde North owners choose us

Independent. Licensed. Insured.

  • Built for a suburb still under construction
  • Engineering drawings read before we arrive
  • Roofs seen from above
  • Items tracked from one stage to the next
Guides

Pre-Handover (PCI) Inspections guides for Clyde North

All guides →

Book pre-handover (pci) inspections in Clyde North

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Clyde North: common questions

How close to handover should we book the visit?

Roughly two weeks before the handover appointment, once the builder says the house is complete. That leaves time for the list to be worked through before you pay.

Why use a drone at handover?

Because roof defects are among the most common items we record in Clyde North, and many two storey roofs cannot be walked safely. The drone shows tiles, capping and flashings at close range.

What is not included when we inspect a Clyde North home before handover?

Testing or certifying electrical, gas and plumbing work, commissioning heating, cooling and appliances, pressure testing, the occupancy permit, and anything concealed or locked. A licensed electrician or plumber covers their own trade.

Can I bring the inspector's list to the handover meeting?

Yes, that is what it is for. Each item is numbered with a room and a photo, so you and the supervisor can walk it together.

Should I sign the handover form if items are still open?

That is between you and the contract, but record the open items in writing first. Paying the final claim removes most of your leverage.

Can you confirm the builder's fixes before settlement?

Yes. A reinspection goes through each original item and records it as fixed, partly fixed or still outstanding.

Is the 10 year warranty a reason to skip this?

No. The statutory warranty and Domestic Building Insurance cover defects later, but a fix done before handover costs you nothing and needs no claim.

CallGet a Free Quote